Obituaries anderson sc

Anderson University SC

2011.08.31 17:40 Claussm Anderson University SC

The official subreddit for Anderson University SC!
[link]


2011.01.18 01:03 Rock Hill, SC

Discussion and topics related to Rock Hill, South Carolina
[link]


2012.07.27 20:25 greenwoodsc Greenwood, SC

Greenwood, SC
[link]


2023.06.02 15:09 MightBeneficial3302 Element 79 Gold Announces 60-Day Extension to Valdo LOI (CSE:ELEM, OTC:ELMGF, FSE: 7YS)

Element 79 Gold Announces 60-Day Extension to Valdo LOI (CSE:ELEM, OTC:ELMGF, FSE: 7YS)

https://preview.redd.it/2jo7iof2tl3b1.png?width=972&format=png&auto=webp&s=38b8736e86c5a74698a29c4b31722b9bca4947a5
VANCOUVER, BC / THENEWSWIRE / May 30, 2023 – Element 79 Gold Corp. (CSE:ELEM) (OTC:ELMGF) (FSE: 7YS) ("Element 79 Gold", the "Company") announces that, further to its November 17, 2022 release announcing that the Company had entered into a non-binding letter of intent (the “Valdo LOI”) with Valdo Minerals Ltd. (“Valdo”), the parties have mutually agreed to a 60-day extension to the exclusivity period to enter into a definitive agreement for the sale of three properties from its Battle Mountain Portfolio located in the northeastern Nevada, US.
The other terms of the LOI, as announced by the Company on November 17, 2022, remain unchanged.
Proposed Transaction Highlights
  • Valdo to acquire 100% interests and obligation in:
    • The North Mill Creek Project - comprised of 6 unpatented claims located at the margins of the Goat Window in Lander County, Nevada, an exposure of lower plate rocks beneath the Roberts Mountains Thrust, the preferred carbonate host of Carlin-type gold deposits.
    • The Elder Creek Project - comprised of 23 unpatented claims, which cover the historic Elder Creek open-pit mine in Lander County, Nevada, hosted in upper plate rocks where the mine area is believed to represent leakage from the deeper lower plate of the Roberts Mountains Thrust.
    • The Elephant Project - comprised of 197 claims located at the foot of the mine dumps at Nevada Gold Mines' Phoenix operation hosting a covered pediment target with various depths of cover based on the displacement of fault blocks.
  • Valdo to issue 3,750,000 common shares at a deemed price of $0.30 CAD per share representing an aggregate value of CAD 1,125,000.
  • According to the revised exclusivity period, the transaction is expected to close by July 15, 2023.
“As we progressed toward the initial term of the LOI, Valdo expressed a desire for an extension as they finalize their project structuring and capitalization plans,” said James Tworek, Element79 Gold Corp CEO. “Our collaboration with Valdo holds great promise, spurred by their continued interest in how the optioned portfolio synergizes with their other regionally adjacent projects, we are confident that this extension will pave the way for a successful closing and strong Valdo story in the future.”
Element79 Gold’s Battle Mountain Portfolio
The Battle Mountain Portfolio was originally comprised of 15 separate projects totaling over 44,478 acres across 2,203 unpatented claims in five counties: Elko County, Eureka County, Humboldt County, Lander County, and Nye County. Most of the Battle Mountain Portfolio is located within the Battle Mountain Trend, with several projects close to globally reputable gold deposits including Nevada Gold's Cortez Mine.
The Battle Mountain Portfolio is comprised primarily of early-stage projects. While drilling has been completed at some projects, such as Elder Creek (155 holes) and Clover (104 holes), many have only surface sampling and geophysical surveys completed. Of particular note are the Long Peak, Elephant, Elder Creek, North Mill Creek, Clipper, Pipeline South, West Cortez, and Walti Projects, which are interpreted to lie along the northwest trending fault that hosts the high-grade Pipeline deposit, which is included in Nevada Gold's Cortez Mine.
Qualified Person
The technical information in this release has been reviewed and verified by Neil Pettigrew, M.Sc., P. Geo., Director of Element79 Gold and a "qualified person" as defined by National Instrument 43-101.
About Element79 Gold
Element79 Gold is a mining company focused on gold, silver and associated metals and committed to maximizing shareholder value through responsible mining practices and sustainable development of its projects. Element79 Gold's main focus is on two core properties: developing its previously-producing, high-grade gold and silver mine, the Lucero project located in Arequipa, Peru, with the intent to bring it back into production in the near term; and its flagship Maverick Springs Project located in the famous gold mining district of northeastern Nevada, USA, between the Elko and White Pine Counties. Maverick Springs hosts a 43-101-compliant, pit-constrained mineral resource estimate reflecting an inferred resource of 3.71 million ounces of gold equivalent "AuEq" at a grade of 0.92 g/t AuEq (0.34 g/t Au and 43.4 g/t Ag) with an effective date of October 19, 2022. The acquisition of the Maverick Springs Project also included a portfolio of 15 properties along the Battle Mountain trend in Nevada, which are non-core to its primary business focus. In British Columbia, Element79 Gold has executed a Letter of Intent and funded a drilling program to acquire a private company that holds the option to 100% interest of the Snowbird High-Grade Gold Project, which consists of 10 mineral claims located in Central British Columbia, approximately 20km west of Fort St. James. The Company also has an option to acquire a 100% interest in the Dale Property, 90 unpatented mining claims located approximately 100 km southwest of Timmins, Ontario, Canada in the Timmins Mining Division, Dale Township. The Company is analyzing the non-core Nevada projects, The Dale Property and Snowbird Property for further merit of exploration, sale or spin-out.
For more information about the Company, please visit www.element79.gold
Contact Information:
James C. Tworek, Chief Executive Officer E-mail: [[email protected]](mailto:[email protected])
For investor relations inquiries, please contact:
Investor Relations Department – Dylan Anderson
Phone: +1 (613) 879-9387
E-mail: [[email protected]](mailto:[email protected])
submitted by MightBeneficial3302 to CanadianStocks [link] [comments]


2023.06.02 15:09 MightBeneficial3302 Element 79 Gold Announces 60-Day Extension to Valdo LOI (CSE:ELEM, OTC:ELMGF, FSE: 7YS)

Element 79 Gold Announces 60-Day Extension to Valdo LOI (CSE:ELEM, OTC:ELMGF, FSE: 7YS)

https://preview.redd.it/ia2neqz3tl3b1.png?width=972&format=png&auto=webp&s=8b52efbfb7066be483ca24fb19b98b69f9eed644
VANCOUVER, BC / THENEWSWIRE / May 30, 2023 – Element 79 Gold Corp. (CSE:ELEM) (OTC:ELMGF) (FSE: 7YS) ("Element 79 Gold", the "Company") announces that, further to its November 17, 2022 release announcing that the Company had entered into a non-binding letter of intent (the “Valdo LOI”) with Valdo Minerals Ltd. (“Valdo”), the parties have mutually agreed to a 60-day extension to the exclusivity period to enter into a definitive agreement for the sale of three properties from its Battle Mountain Portfolio located in the northeastern Nevada, US.
The other terms of the LOI, as announced by the Company on November 17, 2022, remain unchanged.
Proposed Transaction Highlights
  • Valdo to acquire 100% interests and obligation in:
    • The North Mill Creek Project - comprised of 6 unpatented claims located at the margins of the Goat Window in Lander County, Nevada, an exposure of lower plate rocks beneath the Roberts Mountains Thrust, the preferred carbonate host of Carlin-type gold deposits.
    • The Elder Creek Project - comprised of 23 unpatented claims, which cover the historic Elder Creek open-pit mine in Lander County, Nevada, hosted in upper plate rocks where the mine area is believed to represent leakage from the deeper lower plate of the Roberts Mountains Thrust.
    • The Elephant Project - comprised of 197 claims located at the foot of the mine dumps at Nevada Gold Mines' Phoenix operation hosting a covered pediment target with various depths of cover based on the displacement of fault blocks.
  • Valdo to issue 3,750,000 common shares at a deemed price of $0.30 CAD per share representing an aggregate value of CAD 1,125,000.
  • According to the revised exclusivity period, the transaction is expected to close by July 15, 2023.
“As we progressed toward the initial term of the LOI, Valdo expressed a desire for an extension as they finalize their project structuring and capitalization plans,” said James Tworek, Element79 Gold Corp CEO. “Our collaboration with Valdo holds great promise, spurred by their continued interest in how the optioned portfolio synergizes with their other regionally adjacent projects, we are confident that this extension will pave the way for a successful closing and strong Valdo story in the future.”
Element79 Gold’s Battle Mountain Portfolio
The Battle Mountain Portfolio was originally comprised of 15 separate projects totaling over 44,478 acres across 2,203 unpatented claims in five counties: Elko County, Eureka County, Humboldt County, Lander County, and Nye County. Most of the Battle Mountain Portfolio is located within the Battle Mountain Trend, with several projects close to globally reputable gold deposits including Nevada Gold's Cortez Mine.
The Battle Mountain Portfolio is comprised primarily of early-stage projects. While drilling has been completed at some projects, such as Elder Creek (155 holes) and Clover (104 holes), many have only surface sampling and geophysical surveys completed. Of particular note are the Long Peak, Elephant, Elder Creek, North Mill Creek, Clipper, Pipeline South, West Cortez, and Walti Projects, which are interpreted to lie along the northwest trending fault that hosts the high-grade Pipeline deposit, which is included in Nevada Gold's Cortez Mine.
Qualified Person
The technical information in this release has been reviewed and verified by Neil Pettigrew, M.Sc., P. Geo., Director of Element79 Gold and a "qualified person" as defined by National Instrument 43-101.
About Element79 Gold
Element79 Gold is a mining company focused on gold, silver and associated metals and committed to maximizing shareholder value through responsible mining practices and sustainable development of its projects. Element79 Gold's main focus is on two core properties: developing its previously-producing, high-grade gold and silver mine, the Lucero project located in Arequipa, Peru, with the intent to bring it back into production in the near term; and its flagship Maverick Springs Project located in the famous gold mining district of northeastern Nevada, USA, between the Elko and White Pine Counties. Maverick Springs hosts a 43-101-compliant, pit-constrained mineral resource estimate reflecting an inferred resource of 3.71 million ounces of gold equivalent "AuEq" at a grade of 0.92 g/t AuEq (0.34 g/t Au and 43.4 g/t Ag) with an effective date of October 19, 2022. The acquisition of the Maverick Springs Project also included a portfolio of 15 properties along the Battle Mountain trend in Nevada, which are non-core to its primary business focus. In British Columbia, Element79 Gold has executed a Letter of Intent and funded a drilling program to acquire a private company that holds the option to 100% interest of the Snowbird High-Grade Gold Project, which consists of 10 mineral claims located in Central British Columbia, approximately 20km west of Fort St. James. The Company also has an option to acquire a 100% interest in the Dale Property, 90 unpatented mining claims located approximately 100 km southwest of Timmins, Ontario, Canada in the Timmins Mining Division, Dale Township. The Company is analyzing the non-core Nevada projects, The Dale Property and Snowbird Property for further merit of exploration, sale or spin-out.
For more information about the Company, please visit www.element79.gold
Contact Information:
James C. Tworek, Chief Executive Officer E-mail: [[email protected]](mailto:[email protected])
For investor relations inquiries, please contact:
Investor Relations Department – Dylan Anderson
Phone: +1 (613) 879-9387
E-mail: [[email protected]](mailto:[email protected])
submitted by MightBeneficial3302 to PennyCatalysts [link] [comments]


2023.06.01 16:46 Professional_Disk131 Element 79 Gold Announces 60-Day Extension to Valdo LOI (CSE:ELEM) (OTC:ELMGF)(FSE: 7YS)

Element 79 Gold Announces 60-Day Extension to Valdo LOI (CSE:ELEM) (OTC:ELMGF)(FSE: 7YS)

https://preview.redd.it/4tfxaxdq5f3b1.png?width=461&format=png&auto=webp&s=37f492753da00bac970fc68c6d27ca7152a88145
VANCOUVER, BC / THENEWSWIRE / May 30, 2023 – Element 79 Gold Corp. (CSE:ELEM) (OTC:ELMGF) (FSE: 7YS) ("Element 79 Gold", the "Company") announces that, further to its November 17, 2022 release announcing that the Company had entered into a non-binding letter of intent (the “Valdo LOI”) with Valdo Minerals Ltd. (“Valdo”), the parties have mutually agreed to a 60-day extension to the exclusivity period to enter into a definitive agreement for the sale of three properties from its Battle Mountain Portfolio located in the northeastern Nevada, US.
The other terms of the LOI, as announced by the Company on November 17, 2022, remain unchanged.
Proposed Transaction Highlights
  • Valdo to acquire 100% interests and obligation in:
    • The North Mill Creek Project - comprised of 6 unpatented claims located at the margins of the Goat Window in Lander County, Nevada, an exposure of lower plate rocks beneath the Roberts Mountains Thrust, the preferred carbonate host of Carlin-type gold deposits.
    • The Elder Creek Project - comprised of 23 unpatented claims, which cover the historic Elder Creek open-pit mine in Lander County, Nevada, hosted in upper plate rocks where the mine area is believed to represent leakage from the deeper lower plate of the Roberts Mountains Thrust.
    • The Elephant Project - comprised of 197 claims located at the foot of the mine dumps at Nevada Gold Mines' Phoenix operation hosting a covered pediment target with various depths of cover based on the displacement of fault blocks.
  • Valdo to issue 3,750,000 common shares at a deemed price of $0.30 CAD per share representing an aggregate value of CAD 1,125,000.
  • According to the revised exclusivity period, the transaction is expected to close by July 15, 2023.
“As we progressed toward the initial term of the LOI, Valdo expressed a desire for an extension as they finalize their project structuring and capitalization plans,” said James Tworek, Element79 Gold Corp CEO. “Our collaboration with Valdo holds great promise, spurred by their continued interest in how the optioned portfolio synergizes with their other regionally adjacent projects, we are confident that this extension will pave the way for a successful closing and strong Valdo story in the future.”
Element79 Gold’s Battle Mountain Portfolio
The Battle Mountain Portfolio was originally comprised of 15 separate projects totaling over 44,478 acres across 2,203 unpatented claims in five counties: Elko County, Eureka County, Humboldt County, Lander County, and Nye County. Most of the Battle Mountain Portfolio is located within the Battle Mountain Trend, with several projects close to globally reputable gold deposits including Nevada Gold's Cortez Mine.
The Battle Mountain Portfolio is comprised primarily of early-stage projects. While drilling has been completed at some projects, such as Elder Creek (155 holes) and Clover (104 holes), many have only surface sampling and geophysical surveys completed. Of particular note are the Long Peak, Elephant, Elder Creek, North Mill Creek, Clipper, Pipeline South, West Cortez, and Walti Projects, which are interpreted to lie along the northwest trending fault that hosts the high-grade Pipeline deposit, which is included in Nevada Gold's Cortez Mine.
Qualified Person
The technical information in this release has been reviewed and verified by Neil Pettigrew, M.Sc., P. Geo., Director of Element79 Gold and a "qualified person" as defined by National Instrument 43-101.
About Element79 Gold
Element79 Gold is a mining company focused on gold, silver and associated metals and committed to maximizing shareholder value through responsible mining practices and sustainable development of its projects. Element79 Gold's main focus is on two core properties: developing its previously-producing, high-grade gold and silver mine, the Lucero project located in Arequipa, Peru, with the intent to bring it back into production in the near term; and its flagship Maverick Springs Project located in the famous gold mining district of northeastern Nevada, USA, between the Elko and White Pine Counties. Maverick Springs hosts a 43-101-compliant, pit-constrained mineral resource estimate reflecting an inferred resource of 3.71 million ounces of gold equivalent "AuEq" at a grade of 0.92 g/t AuEq (0.34 g/t Au and 43.4 g/t Ag) with an effective date of October 19, 2022. The acquisition of the Maverick Springs Project also included a portfolio of 15 properties along the Battle Mountain trend in Nevada, which are non-core to its primary business focus. In British Columbia, Element79 Gold has executed a Letter of Intent and funded a drilling program to acquire a private company that holds the option to 100% interest of the Snowbird High-Grade Gold Project, which consists of 10 mineral claims located in Central British Columbia, approximately 20km west of Fort St. James. The Company also has an option to acquire a 100% interest in the Dale Property, 90 unpatented mining claims located approximately 100 km southwest of Timmins, Ontario, Canada in the Timmins Mining Division, Dale Township. The Company is analyzing the non-core Nevada projects, The Dale Property and Snowbird Property for further merit of exploration, sale or spin-out.
For more information about the Company, please visit www.element79.gold
Contact Information:
James C. Tworek, Chief Executive Officer E-mail: [[email protected]](mailto:[email protected])
For investor relations inquiries, please contact:
Investor Relations Department – Dylan Anderson
Phone: +1 (613) 879-9387
E-mail: [[email protected]](mailto:[email protected])
submitted by Professional_Disk131 to Miningstocks [link] [comments]


2023.06.01 16:46 Professional_Disk131 Element 79 Gold Announces 60-Day Extension to Valdo LOI (CSE:ELEM) (OTC:ELMGF)(FSE: 7YS)

Element 79 Gold Announces 60-Day Extension to Valdo LOI (CSE:ELEM) (OTC:ELMGF)(FSE: 7YS)

https://preview.redd.it/lpmrsbem5f3b1.png?width=461&format=png&auto=webp&s=1b71ae6b6c0cc5b593c33215ef940f5209d4529d
VANCOUVER, BC / THENEWSWIRE / May 30, 2023 – Element 79 Gold Corp. (CSE:ELEM) (OTC:ELMGF) (FSE: 7YS) ("Element 79 Gold", the "Company") announces that, further to its November 17, 2022 release announcing that the Company had entered into a non-binding letter of intent (the “Valdo LOI”) with Valdo Minerals Ltd. (“Valdo”), the parties have mutually agreed to a 60-day extension to the exclusivity period to enter into a definitive agreement for the sale of three properties from its Battle Mountain Portfolio located in the northeastern Nevada, US.
The other terms of the LOI, as announced by the Company on November 17, 2022, remain unchanged.
Proposed Transaction Highlights
  • Valdo to acquire 100% interests and obligation in:
    • The North Mill Creek Project - comprised of 6 unpatented claims located at the margins of the Goat Window in Lander County, Nevada, an exposure of lower plate rocks beneath the Roberts Mountains Thrust, the preferred carbonate host of Carlin-type gold deposits.
    • The Elder Creek Project - comprised of 23 unpatented claims, which cover the historic Elder Creek open-pit mine in Lander County, Nevada, hosted in upper plate rocks where the mine area is believed to represent leakage from the deeper lower plate of the Roberts Mountains Thrust.
    • The Elephant Project - comprised of 197 claims located at the foot of the mine dumps at Nevada Gold Mines' Phoenix operation hosting a covered pediment target with various depths of cover based on the displacement of fault blocks.
  • Valdo to issue 3,750,000 common shares at a deemed price of $0.30 CAD per share representing an aggregate value of CAD 1,125,000.
  • According to the revised exclusivity period, the transaction is expected to close by July 15, 2023.
“As we progressed toward the initial term of the LOI, Valdo expressed a desire for an extension as they finalize their project structuring and capitalization plans,” said James Tworek, Element79 Gold Corp CEO. “Our collaboration with Valdo holds great promise, spurred by their continued interest in how the optioned portfolio synergizes with their other regionally adjacent projects, we are confident that this extension will pave the way for a successful closing and strong Valdo story in the future.”
Element79 Gold’s Battle Mountain Portfolio
The Battle Mountain Portfolio was originally comprised of 15 separate projects totaling over 44,478 acres across 2,203 unpatented claims in five counties: Elko County, Eureka County, Humboldt County, Lander County, and Nye County. Most of the Battle Mountain Portfolio is located within the Battle Mountain Trend, with several projects close to globally reputable gold deposits including Nevada Gold's Cortez Mine.
The Battle Mountain Portfolio is comprised primarily of early-stage projects. While drilling has been completed at some projects, such as Elder Creek (155 holes) and Clover (104 holes), many have only surface sampling and geophysical surveys completed. Of particular note are the Long Peak, Elephant, Elder Creek, North Mill Creek, Clipper, Pipeline South, West Cortez, and Walti Projects, which are interpreted to lie along the northwest trending fault that hosts the high-grade Pipeline deposit, which is included in Nevada Gold's Cortez Mine.
Qualified Person
The technical information in this release has been reviewed and verified by Neil Pettigrew, M.Sc., P. Geo., Director of Element79 Gold and a "qualified person" as defined by National Instrument 43-101.
About Element79 Gold
Element79 Gold is a mining company focused on gold, silver and associated metals and committed to maximizing shareholder value through responsible mining practices and sustainable development of its projects. Element79 Gold's main focus is on two core properties: developing its previously-producing, high-grade gold and silver mine, the Lucero project located in Arequipa, Peru, with the intent to bring it back into production in the near term; and its flagship Maverick Springs Project located in the famous gold mining district of northeastern Nevada, USA, between the Elko and White Pine Counties. Maverick Springs hosts a 43-101-compliant, pit-constrained mineral resource estimate reflecting an inferred resource of 3.71 million ounces of gold equivalent "AuEq" at a grade of 0.92 g/t AuEq (0.34 g/t Au and 43.4 g/t Ag) with an effective date of October 19, 2022. The acquisition of the Maverick Springs Project also included a portfolio of 15 properties along the Battle Mountain trend in Nevada, which are non-core to its primary business focus. In British Columbia, Element79 Gold has executed a Letter of Intent and funded a drilling program to acquire a private company that holds the option to 100% interest of the Snowbird High-Grade Gold Project, which consists of 10 mineral claims located in Central British Columbia, approximately 20km west of Fort St. James. The Company also has an option to acquire a 100% interest in the Dale Property, 90 unpatented mining claims located approximately 100 km southwest of Timmins, Ontario, Canada in the Timmins Mining Division, Dale Township. The Company is analyzing the non-core Nevada projects, The Dale Property and Snowbird Property for further merit of exploration, sale or spin-out.
For more information about the Company, please visit www.element79.gold
Contact Information:
James C. Tworek, Chief Executive Officer E-mail: [[email protected]](mailto:[email protected])
For investor relations inquiries, please contact:
Investor Relations Department – Dylan Anderson
Phone: +1 (613) 879-9387
E-mail: [[email protected]](mailto:[email protected])
submitted by Professional_Disk131 to marketpredictors [link] [comments]


2023.06.01 16:45 Professional_Disk131 Element 79 Gold Announces 60-Day Extension to Valdo LOI (CSE:ELEM) (OTC:ELMGF)(FSE: 7YS)

Element 79 Gold Announces 60-Day Extension to Valdo LOI (CSE:ELEM) (OTC:ELMGF)(FSE: 7YS)

https://preview.redd.it/nfgvlkjj5f3b1.png?width=461&format=png&auto=webp&s=597feb7f28b8b149be9dbe316ab0ec4a284dcf55
VANCOUVER, BC / THENEWSWIRE / May 30, 2023 – Element 79 Gold Corp. (CSE:ELEM) (OTC:ELMGF) (FSE: 7YS) ("Element 79 Gold", the "Company") announces that, further to its November 17, 2022 release announcing that the Company had entered into a non-binding letter of intent (the “Valdo LOI”) with Valdo Minerals Ltd. (“Valdo”), the parties have mutually agreed to a 60-day extension to the exclusivity period to enter into a definitive agreement for the sale of three properties from its Battle Mountain Portfolio located in the northeastern Nevada, US.
The other terms of the LOI, as announced by the Company on November 17, 2022, remain unchanged.
Proposed Transaction Highlights
  • Valdo to acquire 100% interests and obligation in:
    • The North Mill Creek Project - comprised of 6 unpatented claims located at the margins of the Goat Window in Lander County, Nevada, an exposure of lower plate rocks beneath the Roberts Mountains Thrust, the preferred carbonate host of Carlin-type gold deposits.
    • The Elder Creek Project - comprised of 23 unpatented claims, which cover the historic Elder Creek open-pit mine in Lander County, Nevada, hosted in upper plate rocks where the mine area is believed to represent leakage from the deeper lower plate of the Roberts Mountains Thrust.
    • The Elephant Project - comprised of 197 claims located at the foot of the mine dumps at Nevada Gold Mines' Phoenix operation hosting a covered pediment target with various depths of cover based on the displacement of fault blocks.
  • Valdo to issue 3,750,000 common shares at a deemed price of $0.30 CAD per share representing an aggregate value of CAD 1,125,000.
  • According to the revised exclusivity period, the transaction is expected to close by July 15, 2023.
“As we progressed toward the initial term of the LOI, Valdo expressed a desire for an extension as they finalize their project structuring and capitalization plans,” said James Tworek, Element79 Gold Corp CEO. “Our collaboration with Valdo holds great promise, spurred by their continued interest in how the optioned portfolio synergizes with their other regionally adjacent projects, we are confident that this extension will pave the way for a successful closing and strong Valdo story in the future.”
Element79 Gold’s Battle Mountain Portfolio
The Battle Mountain Portfolio was originally comprised of 15 separate projects totaling over 44,478 acres across 2,203 unpatented claims in five counties: Elko County, Eureka County, Humboldt County, Lander County, and Nye County. Most of the Battle Mountain Portfolio is located within the Battle Mountain Trend, with several projects close to globally reputable gold deposits including Nevada Gold's Cortez Mine.
The Battle Mountain Portfolio is comprised primarily of early-stage projects. While drilling has been completed at some projects, such as Elder Creek (155 holes) and Clover (104 holes), many have only surface sampling and geophysical surveys completed. Of particular note are the Long Peak, Elephant, Elder Creek, North Mill Creek, Clipper, Pipeline South, West Cortez, and Walti Projects, which are interpreted to lie along the northwest trending fault that hosts the high-grade Pipeline deposit, which is included in Nevada Gold's Cortez Mine.
Qualified Person
The technical information in this release has been reviewed and verified by Neil Pettigrew, M.Sc., P. Geo., Director of Element79 Gold and a "qualified person" as defined by National Instrument 43-101.
About Element79 Gold
Element79 Gold is a mining company focused on gold, silver and associated metals and committed to maximizing shareholder value through responsible mining practices and sustainable development of its projects. Element79 Gold's main focus is on two core properties: developing its previously-producing, high-grade gold and silver mine, the Lucero project located in Arequipa, Peru, with the intent to bring it back into production in the near term; and its flagship Maverick Springs Project located in the famous gold mining district of northeastern Nevada, USA, between the Elko and White Pine Counties. Maverick Springs hosts a 43-101-compliant, pit-constrained mineral resource estimate reflecting an inferred resource of 3.71 million ounces of gold equivalent "AuEq" at a grade of 0.92 g/t AuEq (0.34 g/t Au and 43.4 g/t Ag) with an effective date of October 19, 2022. The acquisition of the Maverick Springs Project also included a portfolio of 15 properties along the Battle Mountain trend in Nevada, which are non-core to its primary business focus. In British Columbia, Element79 Gold has executed a Letter of Intent and funded a drilling program to acquire a private company that holds the option to 100% interest of the Snowbird High-Grade Gold Project, which consists of 10 mineral claims located in Central British Columbia, approximately 20km west of Fort St. James. The Company also has an option to acquire a 100% interest in the Dale Property, 90 unpatented mining claims located approximately 100 km southwest of Timmins, Ontario, Canada in the Timmins Mining Division, Dale Township. The Company is analyzing the non-core Nevada projects, The Dale Property and Snowbird Property for further merit of exploration, sale or spin-out.
For more information about the Company, please visit www.element79.gold
Contact Information:
James C. Tworek, Chief Executive Officer E-mail: [[email protected]](mailto:[email protected])
For investor relations inquiries, please contact:
Investor Relations Department – Dylan Anderson
Phone: +1 (613) 879-9387
E-mail: [[email protected]](mailto:[email protected])
submitted by Professional_Disk131 to CanadianStockExchange [link] [comments]


2023.06.01 16:44 Professional_Disk131 Element 79 Gold Announces 60-Day Extension to Valdo LOI (CSE:ELEM) (OTC:ELMGF)(FSE: 7YS)

Element 79 Gold Announces 60-Day Extension to Valdo LOI (CSE:ELEM) (OTC:ELMGF)(FSE: 7YS)

https://preview.redd.it/nzaphj0f5f3b1.png?width=461&format=png&auto=webp&s=48d9cc527da9b2e28bd56c1087b2739cf398fcb4
VANCOUVER, BC / THENEWSWIRE / May 30, 2023 – Element 79 Gold Corp. (CSE:ELEM) (OTC:ELMGF) (FSE: 7YS) ("Element 79 Gold", the "Company") announces that, further to its November 17, 2022 release announcing that the Company had entered into a non-binding letter of intent (the “Valdo LOI”) with Valdo Minerals Ltd. (“Valdo”), the parties have mutually agreed to a 60-day extension to the exclusivity period to enter into a definitive agreement for the sale of three properties from its Battle Mountain Portfolio located in the northeastern Nevada, US.
The other terms of the LOI, as announced by the Company on November 17, 2022, remain unchanged.
Proposed Transaction Highlights
  • Valdo to acquire 100% interests and obligation in:
    • The North Mill Creek Project - comprised of 6 unpatented claims located at the margins of the Goat Window in Lander County, Nevada, an exposure of lower plate rocks beneath the Roberts Mountains Thrust, the preferred carbonate host of Carlin-type gold deposits.
    • The Elder Creek Project - comprised of 23 unpatented claims, which cover the historic Elder Creek open-pit mine in Lander County, Nevada, hosted in upper plate rocks where the mine area is believed to represent leakage from the deeper lower plate of the Roberts Mountains Thrust.
    • The Elephant Project - comprised of 197 claims located at the foot of the mine dumps at Nevada Gold Mines' Phoenix operation hosting a covered pediment target with various depths of cover based on the displacement of fault blocks.
  • Valdo to issue 3,750,000 common shares at a deemed price of $0.30 CAD per share representing an aggregate value of CAD 1,125,000.
  • According to the revised exclusivity period, the transaction is expected to close by July 15, 2023.
“As we progressed toward the initial term of the LOI, Valdo expressed a desire for an extension as they finalize their project structuring and capitalization plans,” said James Tworek, Element79 Gold Corp CEO. “Our collaboration with Valdo holds great promise, spurred by their continued interest in how the optioned portfolio synergizes with their other regionally adjacent projects, we are confident that this extension will pave the way for a successful closing and strong Valdo story in the future.”
Element79 Gold’s Battle Mountain Portfolio
The Battle Mountain Portfolio was originally comprised of 15 separate projects totaling over 44,478 acres across 2,203 unpatented claims in five counties: Elko County, Eureka County, Humboldt County, Lander County, and Nye County. Most of the Battle Mountain Portfolio is located within the Battle Mountain Trend, with several projects close to globally reputable gold deposits including Nevada Gold's Cortez Mine.
The Battle Mountain Portfolio is comprised primarily of early-stage projects. While drilling has been completed at some projects, such as Elder Creek (155 holes) and Clover (104 holes), many have only surface sampling and geophysical surveys completed. Of particular note are the Long Peak, Elephant, Elder Creek, North Mill Creek, Clipper, Pipeline South, West Cortez, and Walti Projects, which are interpreted to lie along the northwest trending fault that hosts the high-grade Pipeline deposit, which is included in Nevada Gold's Cortez Mine.
Qualified Person
The technical information in this release has been reviewed and verified by Neil Pettigrew, M.Sc., P. Geo., Director of Element79 Gold and a "qualified person" as defined by National Instrument 43-101.
About Element79 Gold
Element79 Gold is a mining company focused on gold, silver and associated metals and committed to maximizing shareholder value through responsible mining practices and sustainable development of its projects. Element79 Gold's main focus is on two core properties: developing its previously-producing, high-grade gold and silver mine, the Lucero project located in Arequipa, Peru, with the intent to bring it back into production in the near term; and its flagship Maverick Springs Project located in the famous gold mining district of northeastern Nevada, USA, between the Elko and White Pine Counties. Maverick Springs hosts a 43-101-compliant, pit-constrained mineral resource estimate reflecting an inferred resource of 3.71 million ounces of gold equivalent "AuEq" at a grade of 0.92 g/t AuEq (0.34 g/t Au and 43.4 g/t Ag) with an effective date of October 19, 2022. The acquisition of the Maverick Springs Project also included a portfolio of 15 properties along the Battle Mountain trend in Nevada, which are non-core to its primary business focus. In British Columbia, Element79 Gold has executed a Letter of Intent and funded a drilling program to acquire a private company that holds the option to 100% interest of the Snowbird High-Grade Gold Project, which consists of 10 mineral claims located in Central British Columbia, approximately 20km west of Fort St. James. The Company also has an option to acquire a 100% interest in the Dale Property, 90 unpatented mining claims located approximately 100 km southwest of Timmins, Ontario, Canada in the Timmins Mining Division, Dale Township. The Company is analyzing the non-core Nevada projects, The Dale Property and Snowbird Property for further merit of exploration, sale or spin-out.
For more information about the Company, please visit www.element79.gold
Contact Information:
James C. Tworek, Chief Executive Officer E-mail: [[email protected]](mailto:[email protected])
For investor relations inquiries, please contact:
Investor Relations Department – Dylan Anderson
Phone: +1 (613) 879-9387
E-mail: [[email protected]](mailto:[email protected])
submitted by Professional_Disk131 to Canadapennystocks [link] [comments]


2023.05.31 16:25 MightBeneficial3302 Element 79 Gold Announces 60-Day Extension to Valdo LOI (CSE:ELEM) (OTC:ELMGF)(FSE: 7YS)

Element 79 Gold Announces 60-Day Extension to Valdo LOI (CSE:ELEM) (OTC:ELMGF)(FSE: 7YS)

https://preview.redd.it/6g9eijf5q73b1.png?width=972&format=png&auto=webp&s=c245a93a4a415e445ae0a133d9ff98c32a707def
VANCOUVER, BC / THENEWSWIRE / May 30, 2023 – Element 79 Gold Corp. (CSE:ELEM) (OTC:ELMGF) (FSE: 7YS) ("Element 79 Gold", the "Company") announces that, further to its November 17, 2022 release announcing that the Company had entered into a non-binding letter of intent (the “Valdo LOI”) with Valdo Minerals Ltd. (“Valdo”), the parties have mutually agreed to a 60-day extension to the exclusivity period to enter into a definitive agreement for the sale of three properties from its Battle Mountain Portfolio located in the northeastern Nevada, US.
The other terms of the LOI, as announced by the Company on November 17, 2022, remain unchanged.
Proposed Transaction Highlights
  • Valdo to acquire 100% interests and obligation in:
    • The North Mill Creek Project - comprised of 6 unpatented claims located at the margins of the Goat Window in Lander County, Nevada, an exposure of lower plate rocks beneath the Roberts Mountains Thrust, the preferred carbonate host of Carlin-type gold deposits.
    • The Elder Creek Project - comprised of 23 unpatented claims, which cover the historic Elder Creek open-pit mine in Lander County, Nevada, hosted in upper plate rocks where the mine area is believed to represent leakage from the deeper lower plate of the Roberts Mountains Thrust.
    • The Elephant Project - comprised of 197 claims located at the foot of the mine dumps at Nevada Gold Mines' Phoenix operation hosting a covered pediment target with various depths of cover based on the displacement of fault blocks.
  • Valdo to issue 3,750,000 common shares at a deemed price of $0.30 CAD per share representing an aggregate value of CAD 1,125,000.
  • According to the revised exclusivity period, the transaction is expected to close by July 15, 2023.
“As we progressed toward the initial term of the LOI, Valdo expressed a desire for an extension as they finalize their project structuring and capitalization plans,” said James Tworek, Element79 Gold Corp CEO. “Our collaboration with Valdo holds great promise, spurred by their continued interest in how the optioned portfolio synergizes with their other regionally adjacent projects, we are confident that this extension will pave the way for a successful closing and strong Valdo story in the future.”
Element79 Gold’s Battle Mountain Portfolio
The Battle Mountain Portfolio was originally comprised of 15 separate projects totaling over 44,478 acres across 2,203 unpatented claims in five counties: Elko County, Eureka County, Humboldt County, Lander County, and Nye County. Most of the Battle Mountain Portfolio is located within the Battle Mountain Trend, with several projects close to globally reputable gold deposits including Nevada Gold's Cortez Mine.
The Battle Mountain Portfolio is comprised primarily of early-stage projects. While drilling has been completed at some projects, such as Elder Creek (155 holes) and Clover (104 holes), many have only surface sampling and geophysical surveys completed. Of particular note are the Long Peak, Elephant, Elder Creek, North Mill Creek, Clipper, Pipeline South, West Cortez, and Walti Projects, which are interpreted to lie along the northwest trending fault that hosts the high-grade Pipeline deposit, which is included in Nevada Gold's Cortez Mine.
Qualified Person
The technical information in this release has been reviewed and verified by Neil Pettigrew, M.Sc., P. Geo., Director of Element79 Gold and a "qualified person" as defined by National Instrument 43-101.
About Element79 Gold
Element79 Gold is a mining company focused on gold, silver and associated metals and committed to maximizing shareholder value through responsible mining practices and sustainable development of its projects. Element79 Gold's main focus is on two core properties: developing its previously-producing, high-grade gold and silver mine, the Lucero project located in Arequipa, Peru, with the intent to bring it back into production in the near term; and its flagship Maverick Springs Project located in the famous gold mining district of northeastern Nevada, USA, between the Elko and White Pine Counties. Maverick Springs hosts a 43-101-compliant, pit-constrained mineral resource estimate reflecting an inferred resource of 3.71 million ounces of gold equivalent "AuEq" at a grade of 0.92 g/t AuEq (0.34 g/t Au and 43.4 g/t Ag) with an effective date of October 19, 2022. The acquisition of the Maverick Springs Project also included a portfolio of 15 properties along the Battle Mountain trend in Nevada, which are non-core to its primary business focus. In British Columbia, Element79 Gold has executed a Letter of Intent and funded a drilling program to acquire a private company that holds the option to 100% interest of the Snowbird High-Grade Gold Project, which consists of 10 mineral claims located in Central British Columbia, approximately 20km west of Fort St. James. The Company also has an option to acquire a 100% interest in the Dale Property, 90 unpatented mining claims located approximately 100 km southwest of Timmins, Ontario, Canada in the Timmins Mining Division, Dale Township. The Company is analyzing the non-core Nevada projects, The Dale Property and Snowbird Property for further merit of exploration, sale or spin-out.
For more information about the Company, please visit www.element79.gold
Contact Information:
James C. Tworek, Chief Executive Officer E-mail: [[email protected]](mailto:[email protected])
For investor relations inquiries, please contact:
Investor Relations Department – Dylan Anderson
Phone: +1 (613) 879-9387
E-mail: [[email protected]](mailto:[email protected])
submitted by MightBeneficial3302 to PennyStocksCanada [link] [comments]


2023.05.31 16:25 MightBeneficial3302 Element 79 Gold Announces 60-Day Extension to Valdo LOI (CSE:ELEM) (OTC:ELMGF)(FSE: 7YS)

Element 79 Gold Announces 60-Day Extension to Valdo LOI (CSE:ELEM) (OTC:ELMGF)(FSE: 7YS)

https://preview.redd.it/f7m887f3q73b1.png?width=972&format=png&auto=webp&s=359a8996e1d0dcac950f802ed168f13b8b795133
VANCOUVER, BC / THENEWSWIRE / May 30, 2023 – Element 79 Gold Corp. (CSE:ELEM) (OTC:ELMGF) (FSE: 7YS) ("Element 79 Gold", the "Company") announces that, further to its November 17, 2022 release announcing that the Company had entered into a non-binding letter of intent (the “Valdo LOI”) with Valdo Minerals Ltd. (“Valdo”), the parties have mutually agreed to a 60-day extension to the exclusivity period to enter into a definitive agreement for the sale of three properties from its Battle Mountain Portfolio located in the northeastern Nevada, US.
The other terms of the LOI, as announced by the Company on November 17, 2022, remain unchanged.
Proposed Transaction Highlights
  • Valdo to acquire 100% interests and obligation in:
    • The North Mill Creek Project - comprised of 6 unpatented claims located at the margins of the Goat Window in Lander County, Nevada, an exposure of lower plate rocks beneath the Roberts Mountains Thrust, the preferred carbonate host of Carlin-type gold deposits.
    • The Elder Creek Project - comprised of 23 unpatented claims, which cover the historic Elder Creek open-pit mine in Lander County, Nevada, hosted in upper plate rocks where the mine area is believed to represent leakage from the deeper lower plate of the Roberts Mountains Thrust.
    • The Elephant Project - comprised of 197 claims located at the foot of the mine dumps at Nevada Gold Mines' Phoenix operation hosting a covered pediment target with various depths of cover based on the displacement of fault blocks.
  • Valdo to issue 3,750,000 common shares at a deemed price of $0.30 CAD per share representing an aggregate value of CAD 1,125,000.
  • According to the revised exclusivity period, the transaction is expected to close by July 15, 2023.
“As we progressed toward the initial term of the LOI, Valdo expressed a desire for an extension as they finalize their project structuring and capitalization plans,” said James Tworek, Element79 Gold Corp CEO. “Our collaboration with Valdo holds great promise, spurred by their continued interest in how the optioned portfolio synergizes with their other regionally adjacent projects, we are confident that this extension will pave the way for a successful closing and strong Valdo story in the future.”
Element79 Gold’s Battle Mountain Portfolio
The Battle Mountain Portfolio was originally comprised of 15 separate projects totaling over 44,478 acres across 2,203 unpatented claims in five counties: Elko County, Eureka County, Humboldt County, Lander County, and Nye County. Most of the Battle Mountain Portfolio is located within the Battle Mountain Trend, with several projects close to globally reputable gold deposits including Nevada Gold's Cortez Mine.
The Battle Mountain Portfolio is comprised primarily of early-stage projects. While drilling has been completed at some projects, such as Elder Creek (155 holes) and Clover (104 holes), many have only surface sampling and geophysical surveys completed. Of particular note are the Long Peak, Elephant, Elder Creek, North Mill Creek, Clipper, Pipeline South, West Cortez, and Walti Projects, which are interpreted to lie along the northwest trending fault that hosts the high-grade Pipeline deposit, which is included in Nevada Gold's Cortez Mine.
Qualified Person
The technical information in this release has been reviewed and verified by Neil Pettigrew, M.Sc., P. Geo., Director of Element79 Gold and a "qualified person" as defined by National Instrument 43-101.
About Element79 Gold
Element79 Gold is a mining company focused on gold, silver and associated metals and committed to maximizing shareholder value through responsible mining practices and sustainable development of its projects. Element79 Gold's main focus is on two core properties: developing its previously-producing, high-grade gold and silver mine, the Lucero project located in Arequipa, Peru, with the intent to bring it back into production in the near term; and its flagship Maverick Springs Project located in the famous gold mining district of northeastern Nevada, USA, between the Elko and White Pine Counties. Maverick Springs hosts a 43-101-compliant, pit-constrained mineral resource estimate reflecting an inferred resource of 3.71 million ounces of gold equivalent "AuEq" at a grade of 0.92 g/t AuEq (0.34 g/t Au and 43.4 g/t Ag) with an effective date of October 19, 2022. The acquisition of the Maverick Springs Project also included a portfolio of 15 properties along the Battle Mountain trend in Nevada, which are non-core to its primary business focus. In British Columbia, Element79 Gold has executed a Letter of Intent and funded a drilling program to acquire a private company that holds the option to 100% interest of the Snowbird High-Grade Gold Project, which consists of 10 mineral claims located in Central British Columbia, approximately 20km west of Fort St. James. The Company also has an option to acquire a 100% interest in the Dale Property, 90 unpatented mining claims located approximately 100 km southwest of Timmins, Ontario, Canada in the Timmins Mining Division, Dale Township. The Company is analyzing the non-core Nevada projects, The Dale Property and Snowbird Property for further merit of exploration, sale or spin-out.
For more information about the Company, please visit www.element79.gold
Contact Information:
James C. Tworek, Chief Executive Officer E-mail: [[email protected]](mailto:[email protected])
For investor relations inquiries, please contact:
Investor Relations Department – Dylan Anderson
Phone: +1 (613) 879-9387
E-mail: [[email protected]](mailto:[email protected])
submitted by MightBeneficial3302 to 10xPennyStocks [link] [comments]


2023.05.30 16:57 MightBeneficial3302 Element 79 Gold Announces 60-Day Extension to Valdo LOI (CSE:ELEM) (OTC:ELMGF)(FSE: 7YS)


https://preview.redd.it/z82bw5gtaz2b1.png?width=972&format=png&auto=webp&s=a939d6e8c61af798fbfdc67f40fc3a64d65d7aec
VANCOUVER, BC / THENEWSWIRE / May 30, 2023 – Element 79 Gold Corp. (CSE:ELEM) (OTC:ELMGF) (FSE: 7YS) ("Element 79 Gold", the "Company") announces that, further to its November 17, 2022 release announcing that the Company had entered into a non-binding letter of intent (the “Valdo LOI”) with Valdo Minerals Ltd. (“Valdo”), the parties have mutually agreed to a 60-day extension to the exclusivity period to enter into a definitive agreement for the sale of three properties from its Battle Mountain Portfolio located in the northeastern Nevada, US.
The other terms of the LOI, as announced by the Company on November 17, 2022, remain unchanged.
Proposed Transaction Highlights
“As we progressed toward the initial term of the LOI, Valdo expressed a desire for an extension as they finalize their project structuring and capitalization plans,” said James Tworek, Element79 Gold Corp CEO. “Our collaboration with Valdo holds great promise, spurred by their continued interest in how the optioned portfolio synergizes with their other regionally adjacent projects, we are confident that this extension will pave the way for a successful closing and strong Valdo story in the future.”
Element79 Gold’s Battle Mountain Portfolio
The Battle Mountain Portfolio was originally comprised of 15 separate projects totaling over 44,478 acres across 2,203 unpatented claims in five counties: Elko County, Eureka County, Humboldt County, Lander County, and Nye County. Most of the Battle Mountain Portfolio is located within the Battle Mountain Trend, with several projects close to globally reputable gold deposits including Nevada Gold's Cortez Mine.
The Battle Mountain Portfolio is comprised primarily of early-stage projects. While drilling has been completed at some projects, such as Elder Creek (155 holes) and Clover (104 holes), many have only surface sampling and geophysical surveys completed. Of particular note are the Long Peak, Elephant, Elder Creek, North Mill Creek, Clipper, Pipeline South, West Cortez, and Walti Projects, which are interpreted to lie along the northwest trending fault that hosts the high-grade Pipeline deposit, which is included in Nevada Gold's Cortez Mine.
Qualified Person
The technical information in this release has been reviewed and verified by Neil Pettigrew, M.Sc., P. Geo., Director of Element79 Gold and a "qualified person" as defined by National Instrument 43-101.
About Element79 Gold
Element79 Gold is a mining company focused on gold, silver and associated metals and committed to maximizing shareholder value through responsible mining practices and sustainable development of its projects. Element79 Gold's main focus is on two core properties: developing its previously-producing, high-grade gold and silver mine, the Lucero project located in Arequipa, Peru, with the intent to bring it back into production in the near term; and its flagship Maverick Springs Project located in the famous gold mining district of northeastern Nevada, USA, between the Elko and White Pine Counties. Maverick Springs hosts a 43-101-compliant, pit-constrained mineral resource estimate reflecting an inferred resource of 3.71 million ounces of gold equivalent "AuEq" at a grade of 0.92 g/t AuEq (0.34 g/t Au and 43.4 g/t Ag) with an effective date of October 19, 2022. The acquisition of the Maverick Springs Project also included a portfolio of 15 properties along the Battle Mountain trend in Nevada, which are non-core to its primary business focus. In British Columbia, Element79 Gold has executed a Letter of Intent and funded a drilling program to acquire a private company that holds the option to 100% interest of the Snowbird High-Grade Gold Project, which consists of 10 mineral claims located in Central British Columbia, approximately 20km west of Fort St. James. The Company also has an option to acquire a 100% interest in the Dale Property, 90 unpatented mining claims located approximately 100 km southwest of Timmins, Ontario, Canada in the Timmins Mining Division, Dale Township. The Company is analyzing the non-core Nevada projects, The Dale Property and Snowbird Property for further merit of exploration, sale or spin-out.
For more information about the Company, please visit www.element79.gold
Contact Information:
James C. Tworek, Chief Executive Officer E-mail: [[email protected]](mailto:[email protected])
For investor relations inquiries, please contact:
Investor Relations Department – Dylan Anderson
Phone: +1 (613) 879-9387
E-mail: [[email protected]](mailto:[email protected])
submitted by MightBeneficial3302 to WSSjuniormining [link] [comments]


2023.05.30 16:56 MightBeneficial3302 Element 79 Gold Announces 60-Day Extension to Valdo LOI (CSE:ELEM) (OTC:ELMGF)(FSE: 7YS)

VANCOUVER, BC / THENEWSWIRE / May 30, 2023 – Element 79 Gold Corp. (CSE:ELEM) (OTC:ELMGF) (FSE: 7YS) ("Element 79 Gold", the "Company") announces that, further to its November 17, 2022 release announcing that the Company had entered into a non-binding letter of intent (the “Valdo LOI”) with Valdo Minerals Ltd. (“Valdo”), the parties have mutually agreed to a 60-day extension to the exclusivity period to enter into a definitive agreement for the sale of three properties from its Battle Mountain Portfolio located in the northeastern Nevada, US. The other terms of the LOI, as announced by the Company on November 17, 2022, remain unchanged. Proposed Transaction Highlights Valdo to acquire 100% interests and obligation in:
Valdo to issue 3,750,000 common shares at a deemed price of $0.30 CAD per share representing an aggregate value of CAD 1,125,000. According to the revised exclusivity period, the transaction is expected to close by July 15, 2023. “As we progressed toward the initial term of the LOI, Valdo expressed a desire for an extension as they finalize their project structuring and capitalization plans,” said James Tworek, Element79 Gold Corp CEO. “Our collaboration with Valdo holds great promise, spurred by their continued interest in how the optioned portfolio synergizes with their other regionally adjacent projects, we are confident that this extension will pave the way for a successful closing and strong Valdo story in the future.”
Element79 Gold’s Battle Mountain Portfolio The Battle Mountain Portfolio was originally comprised of 15 separate projects totaling over 44,478 acres across 2,203 unpatented claims in five counties: Elko County, Eureka County, Humboldt County, Lander County, and Nye County. Most of the Battle Mountain Portfolio is located within the Battle Mountain Trend, with several projects close to globally reputable gold deposits including Nevada Gold's Cortez Mine. The Battle Mountain Portfolio is comprised primarily of early-stage projects. While drilling has been completed at some projects, such as Elder Creek (155 holes) and Clover (104 holes), many have only surface sampling and geophysical surveys completed. Of particular note are the Long Peak, Elephant, Elder Creek, North Mill Creek, Clipper, Pipeline South, West Cortez, and Walti Projects, which are interpreted to lie along the northwest trending fault that hosts the high-grade Pipeline deposit, which is included in Nevada Gold's Cortez Mine. Qualified Person The technical information in this release has been reviewed and verified by Neil Pettigrew, M.Sc., P. Geo., Director of Element79 Gold and a "qualified person" as defined by National Instrument 43-101. About Element79 Gold Element79 Gold is a mining company focused on gold, silver and associated metals and committed to maximizing shareholder value through responsible mining practices and sustainable development of its projects. Element79 Gold's main focus is on two core properties: developing its previously-producing, high-grade gold and silver mine, the Lucero project located in Arequipa, Peru, with the intent to bring it back into production in the near term; and its flagship Maverick Springs Project located in the famous gold mining district of northeastern Nevada, USA, between the Elko and White Pine Counties. Maverick Springs hosts a 43-101-compliant, pit-constrained mineral resource estimate reflecting an inferred resource of 3.71 million ounces of gold equivalent "AuEq" at a grade of 0.92 g/t AuEq (0.34 g/t Au and 43.4 g/t Ag) with an effective date of October 19, 2022. The acquisition of the Maverick Springs Project also included a portfolio of 15 properties along the Battle Mountain trend in Nevada, which are non-core to its primary business focus. In British Columbia, Element79 Gold has executed a Letter of Intent and funded a drilling program to acquire a private company that holds the option to 100% interest of the Snowbird High-Grade Gold Project, which consists of 10 mineral claims located in Central British Columbia, approximately 20km west of Fort St. James. The Company also has an option to acquire a 100% interest in the Dale Property, 90 unpatented mining claims located approximately 100 km southwest of Timmins, Ontario, Canada in the Timmins Mining Division, Dale Township. The Company is analyzing the non-core Nevada projects, The Dale Property and Snowbird Property for further merit of exploration, sale or spin-out. For more information about the Company, please visit www.element79.gold Contact Information: James C. Tworek, Chief Executive Officer E-mail: [email protected]
For investor relations inquiries, please contact: Investor Relations Department – Dylan Anderson Phone: +1 (613) 879-9387 E-mail: [email protected]
submitted by MightBeneficial3302 to Pennystock [link] [comments]


2023.05.30 16:26 MightBeneficial3302 Element 79 Gold Announces 60-Day Extension to Valdo LOI (CSE:ELEM) (OTC:ELMGF)(FSE: 7YS)

Element 79 Gold Announces 60-Day Extension to Valdo LOI (CSE:ELEM) (OTC:ELMGF)(FSE: 7YS)

https://preview.redd.it/z82bw5gtaz2b1.png?width=972&format=png&auto=webp&s=a939d6e8c61af798fbfdc67f40fc3a64d65d7aec
VANCOUVER, BC / THENEWSWIRE / May 30, 2023 – Element 79 Gold Corp. (CSE:ELEM) (OTC:ELMGF) (FSE: 7YS) ("Element 79 Gold", the "Company") announces that, further to its November 17, 2022 release announcing that the Company had entered into a non-binding letter of intent (the “Valdo LOI”) with Valdo Minerals Ltd. (“Valdo”), the parties have mutually agreed to a 60-day extension to the exclusivity period to enter into a definitive agreement for the sale of three properties from its Battle Mountain Portfolio located in the northeastern Nevada, US.
The other terms of the LOI, as announced by the Company on November 17, 2022, remain unchanged.
Proposed Transaction Highlights
  • Valdo to acquire 100% interests and obligation in:
    • The North Mill Creek Project - comprised of 6 unpatented claims located at the margins of the Goat Window in Lander County, Nevada, an exposure of lower plate rocks beneath the Roberts Mountains Thrust, the preferred carbonate host of Carlin-type gold deposits.
    • The Elder Creek Project - comprised of 23 unpatented claims, which cover the historic Elder Creek open-pit mine in Lander County, Nevada, hosted in upper plate rocks where the mine area is believed to represent leakage from the deeper lower plate of the Roberts Mountains Thrust.
    • The Elephant Project - comprised of 197 claims located at the foot of the mine dumps at Nevada Gold Mines' Phoenix operation hosting a covered pediment target with various depths of cover based on the displacement of fault blocks.
  • Valdo to issue 3,750,000 common shares at a deemed price of $0.30 CAD per share representing an aggregate value of CAD 1,125,000.
  • According to the revised exclusivity period, the transaction is expected to close by July 15, 2023.
“As we progressed toward the initial term of the LOI, Valdo expressed a desire for an extension as they finalize their project structuring and capitalization plans,” said James Tworek, Element79 Gold Corp CEO. “Our collaboration with Valdo holds great promise, spurred by their continued interest in how the optioned portfolio synergizes with their other regionally adjacent projects, we are confident that this extension will pave the way for a successful closing and strong Valdo story in the future.”
Element79 Gold’s Battle Mountain Portfolio
The Battle Mountain Portfolio was originally comprised of 15 separate projects totaling over 44,478 acres across 2,203 unpatented claims in five counties: Elko County, Eureka County, Humboldt County, Lander County, and Nye County. Most of the Battle Mountain Portfolio is located within the Battle Mountain Trend, with several projects close to globally reputable gold deposits including Nevada Gold's Cortez Mine.
The Battle Mountain Portfolio is comprised primarily of early-stage projects. While drilling has been completed at some projects, such as Elder Creek (155 holes) and Clover (104 holes), many have only surface sampling and geophysical surveys completed. Of particular note are the Long Peak, Elephant, Elder Creek, North Mill Creek, Clipper, Pipeline South, West Cortez, and Walti Projects, which are interpreted to lie along the northwest trending fault that hosts the high-grade Pipeline deposit, which is included in Nevada Gold's Cortez Mine.
Qualified Person
The technical information in this release has been reviewed and verified by Neil Pettigrew, M.Sc., P. Geo., Director of Element79 Gold and a "qualified person" as defined by National Instrument 43-101.
About Element79 Gold
Element79 Gold is a mining company focused on gold, silver and associated metals and committed to maximizing shareholder value through responsible mining practices and sustainable development of its projects. Element79 Gold's main focus is on two core properties: developing its previously-producing, high-grade gold and silver mine, the Lucero project located in Arequipa, Peru, with the intent to bring it back into production in the near term; and its flagship Maverick Springs Project located in the famous gold mining district of northeastern Nevada, USA, between the Elko and White Pine Counties. Maverick Springs hosts a 43-101-compliant, pit-constrained mineral resource estimate reflecting an inferred resource of 3.71 million ounces of gold equivalent "AuEq" at a grade of 0.92 g/t AuEq (0.34 g/t Au and 43.4 g/t Ag) with an effective date of October 19, 2022. The acquisition of the Maverick Springs Project also included a portfolio of 15 properties along the Battle Mountain trend in Nevada, which are non-core to its primary business focus. In British Columbia, Element79 Gold has executed a Letter of Intent and funded a drilling program to acquire a private company that holds the option to 100% interest of the Snowbird High-Grade Gold Project, which consists of 10 mineral claims located in Central British Columbia, approximately 20km west of Fort St. James. The Company also has an option to acquire a 100% interest in the Dale Property, 90 unpatented mining claims located approximately 100 km southwest of Timmins, Ontario, Canada in the Timmins Mining Division, Dale Township. The Company is analyzing the non-core Nevada projects, The Dale Property and Snowbird Property for further merit of exploration, sale or spin-out.
For more information about the Company, please visit www.element79.gold
Contact Information:
James C. Tworek, Chief Executive Officer E-mail: [[email protected]](mailto:[email protected])
For investor relations inquiries, please contact:
Investor Relations Department – Dylan Anderson
Phone: +1 (613) 879-9387
E-mail: [[email protected]](mailto:[email protected])
submitted by MightBeneficial3302 to SmallCap_MiningStocks [link] [comments]


2023.05.30 03:45 Purtle [PIL] #955 5/29/2023

Purtle's Internet Lineup for May 29th, 2023 9:46pm
Pics:
Clips:
Videos
Articles/News/Other
submitted by Purtle to Purtle [link] [comments]


2023.05.29 18:03 subredditsummarybot Your weekly /r/losangeleskings roundup for the week of May 22 - May 28

Monday, May 22 - Sunday, May 28

Top videos

score comments title & link
135 21 comments This Day in Kings’ History (2012): Kings defeat the Coyotes in overtime and advance to the Stanley Cup Final
85 7 comments This Day in Kings’ History (2014): Drew Doughty scores his first career playoff game-winner versus Chicago
71 5 comments This Day in Kings’ History (2014): Kings take a 3-1 series lead in the Western Conference Final
70 10 comments Is there a more iconic goalie mask of the ‘90s than Felix Potvin?
29 5 comments Quinton Byfield Highlights (LA Kings Prospect)
 

Top Remaining Posts

score comments title & link
111 7 comments Happy 24th birthday to Mikey Anderson!
77 52 comments I firmly believe if we played any other team besides the oilers in the first round we would have won
76 31 comments 2023 Florida Panthers A Lot Like the 2012 LA Kings SC Team
44 74 comments Out of all the available free agents which player do you want on the kings the most?
41 26 comments Kings Kaliyev Could be Running Out of Time in LA | LA Hockey Now
31 75 comments Stanley Finals
29 113 comments What’s your stance on Matthew Tkachuk?
29 4 comments Kings Review: Gabe Vilardi Has Another Level
26 25 comments Kings Trade Rumors: Hellebuyck a Possibility & Boston’s Goalie Tandem
23 27 comments Do the Kings Have the Right Players to Win a Cup?
 
submitted by subredditsummarybot to losangeleskings [link] [comments]


2023.05.29 13:09 kukusek Loan report 29.05. 22-23 Summary. Not yet championship edition.

Okaaay, so we're still shaking after the game, and already shaking before next season. Time to wrap things up.
Let's start with the Ladies team, they finished 6th and deserve some recognition. I don't follow WSL much, so i'll help myself with BBC Sport Emma Sanders quote:
"Their form dipped in the final few months and they still lack consistency but given they were fighting relegation last year, this can be viewed as a very successful campaign and they have solid foundations to build on. "
Also worth noting, our Women's team played their last game away at City, were losing 3:0 but still managed to scare them by going 3:2, knowing these 3 points don't matter to our place in the table. Their lost their last game of the season but put up a fair fight.
U18:
First full season under Leighton Baines ended at 4th place in the Under-18 Premier League North.
“For our lads, the development comes before the winning,” he said. “The winning still has to matter because they’re getting older and closer to the real game. We create that environment on a Saturday as balanced as we can. We work on certain things during the week and we’re willing to practise them on the weekend, even if it may be to a detriment of the potential outcome.
“At the same time, the kids play football, and they want to win. We’re not trying to create an overly sanitised environment where they don’t know how to win and where they don’t know how to play under pressure. We find a balance of those two things. What I’ve been blessed with this year, is that the lads have built a really strong bond and team spirit. I think that’s been reflected in some of those comeback performances and the ability to dig in." - Leighton words on his first coaching season.
https://www.evertonfc.com/news/3340734/baines-reflects-on-impressive-maiden-year-as-a-coach
Since last report - Two draws against MU, draw against Newcastle, and a home win vs Stoke.
U19:
Also our u19 team played at Nawi Mumbai PL Next gen cup last two weeks, in which their ended third in their group and lost their playoff game to go further. Some games were played in 37'C heat.
U21:
Youngsters finished eight in the PL2 _ Division 1. What is more impressive, they managed to get to quarterfinals in the PL International Cup, beaten by the final winners PSV Eindhoven U21, and to 1/16 in both PL Cup and EFL Trophy(beaten by Senior Lincoln team). That was first Paul Tait season as U21 coach. Results went downwards after the january transfer window, when Tom Cannon went on loan, and Joe Anderson and Seb Quirk joined Sunderland and Accrington Stanley on permament transfers. Some words from the coach:
“It gave the boys a lot of confidence they could go on and play men’s football,” he explained. “The likes of Tom Cannon, Joe Anderson and Seb Quirk all got good moves
“Tom played against these experienced players in the Papa John’s and then went on to have a really successful loan spell at Preston North End.”
“It was a huge transition between January and March," he added. "Players went out and we needed replacements, but I felt we found our feet again towards the end of the season.
“It’s not easy for some of the Under-18s transitioning through. They can find the jump hard, but they’ve done well. We’ve had lads like Owen Barker, Halid Djankpata and Roman Dixon coming through and impressing.
“Roman joined us in the past few weeks and knows the level that is required now. It’s important for these players to experience it. Ishe Samuels-Smith has been with us since the start and has been brilliant, as have Katia Kouyate and Francis Okoronkwo.”
Since last loan report: Win and loss against Leicester, and Loss away vs Arsenal.
Loanees:
João Virgínia (SC Cambuur) - Last time on the bench - 21.04 - since then probably they were sure of the relegation and preferred their own players. Joao last game played was 21.01 and it was a bad one. Then he was benched, and changing of manager didn't help him either. Even when new first choice keeper made multiple blunders, manager kept with him. Contracted till 2024
Andre Gomes (Lille OSC) - He found his place and a manager that uses him well. Lille sits 4th which grants them Europe league, with one round to play next week. They have to win with already relegated Troyes, otherwise they might fall even to 6th. Andre Played 5 matches from the 7 Lille played since last report - 3 wins and 2 draw. One loss and win without Andre. To end it on a happy note, here are some highlights, with two goals as beautiful as Andre is. Recommended ! Contracted till 2024
https://youtu.be/MQMj43reBmM - Andre bangers!
Jarrad Branthwaite (PSV Eindhoven) - He's the hope for us, won the Cup, and ended second with PSV Eindhoven. After a rough start he became a natural starter. PSV would love to keep him, but they would have to break all the banks in Netherland. Contracted till 2025
Since last report: 7 games, all with Jarrad. 6 wins, 1 draw against Heerenveen, PSV last home game(That wasn't a great game by Jarrad, but that happens).
https://youtu.be/g3hrvYMxB4M - Cup Final with Jarrad OG. Keeping Ajax in check was never meant to be easy. Love his sprint around 1:25 to provide support though.
Niels Nkounkou (Saint-Etienne) - That's our Second French league hot cake, and definitely not a fullback. ASSE is 10th with one game to go, and still can finish form 12 to 6th. They were dancing with relegation zone when he came there. I wonder what comes next for this guy. 6 goals 7 assists since january.
https://youtu.be/u1F3QCWb9R8 - assist vs Guingamp
https://youtu.be/Rhso0dEBgnM - goal Vs Metz
Dele Alli (Beşiktaş JK) - Last involvement in football - 26.02 match against Antalayaspor. For more news visit Celebrities rumours section of some shady journo outlet. Contracted till 2024. Ughh
Jean-Philipe Gbamin (Trabzonspor) - At least he's still involved in football, played in 4th of 5 matches since the last report. Always subbed on in the last 20 minutes. Two rounds to go. No idea about what to do with guy, but at least he's on the field sometimes. Contracted till 2024
Thomas Cannon (Preston North End) - After a great spell, with a lot of goals scored, there comes a slump. From 5 last games, PNE lost 4, and drew 1. Tom scored one goal in this time, against Swansea, but it meant nothing in the end (4:2 loss). PNE buried the small chance it had of getting to playoffs and finished 12th. 8 goals and 1 assist since January. His contract is valid till 2025.
https://youtu.be/n785ACurXI0 - goal against Swansea
Lewis Dobbin (Derby County) - Derby really lost their way at the end and landed in 7th place. Dobbin always played the role of a fresh energy sub, but didn't get an goal or an assist since the end of february. This season numbers: 3 goals, 1 penalty won, 4 assists. + one goal in a EFL Trophy, and one assist in a cup. He has a contract till 2025.
Lewis Warrington (Fleetwood Town) - 2 Wins, 2 losses, one draw since last report, all with Lewis playing. In terms of game time per season - clear winner, he missed only a few games. As a midfielder playing under Scott Brown, he surely learned something. Only one assist to his name, but also no red cards and no errors, and he mostly plays as the last midfielder, screening defence. Fleetwood Town ended season in 13th place. He could find a loan in the championship next year. Contracted till 2024
Ryan Astley (Accrington Stanley) - Haven't played since february, kept out by injuries. When healthy, played all the games he could. Accrington Stanley are relegated to League Two now, but i can see them, or even some League One club wanting him to play if healthy. He's out of contract this summer. Seb Quirk joined him and penned a deal with AS this january.
Lewis Gibson (Bristol Rovers) - I'm happy to finally see this kid play some football without injury. When he showed his quality, he quickly became a starter for BR, playing as CB and occasionally as LB. They ended 17th(5 losses and 2 draws since last report), and could sign him permamently as he's out of contract this summer. Surely some League One club will go for him.
Tyler Onyango (Forest Green Rovers) - He had to fight for his place during the Burton Albion loan, and played not regularly under Dino. Then he(with Everton club) took a gamble and sent him to Forest Green Rovers, to play under Big Dunc he knew very well. No one could have predicted the injury that kept him out after playing just 3 games for the Green team. Fun fact - Burton Albion fought against relegation when he was there, and they ended 15th, but Forest Green Rovers ended being relegated from the last place. He's 20y.o. contracted till 2025.
Harry Tyrer (Chester) - The National League North Team of the Season 2022/23
"The Everton loanee has had quite the season down CH1. Recruited last summer on a season-long deal, Tyrer was quick to show his key attributes.
His dominance inside the box was clear for all to see, as was his remarkable shot stopping. His distribution isn’t bad either – that assist for Kurt Willoughby’s winner at home to Bradford (PA) springs to mind!
A fan favourite from day one, his signature dive into the Chester fans after away victories became a highlight on the road. A record of 21 clean sheets in his 55 appearances isn’t bad either.
Harry evidently has a bright future in the game and has been a credit to the Blues both on and off the pitch – he will always be fondly remembered at the Deva." - Chester FC
Chester sadly lost against Brackley 0:1 in the promotion playoffs.
Harry has contract with the club till 2025
Thank You guys. Sorry for being chaotic, but with the relegation battle going on i couldn't focus on doing these regularly. It's gonna be a hard next season, but i look forward to how our academy will look like next year as changes made under Thelwell should be more evident.
submitted by kukusek to Everton [link] [comments]


2023.05.28 19:58 Squizz What is wrong with ABRP? Any other start point and it works fine....

What is wrong with ABRP? Any other start point and it works fine.... submitted by Squizz to abetterrouteplanner [link] [comments]


2023.05.28 17:30 No_Competition4897 [HIRING] 25 Jobs in SC Hiring Now!

Company Name Title City
CKE Restaurants Holdings, Inc. Fast Food Restaurant Shift Manager Anderson
Texas Roadhouse Hostess Anderson
Encompass Health RN Beaufort
Kimberly-Clark Product Development Engineer Beech Island
CKE Restaurants Holdings, Inc. Fast Food Restaurant Shift Manager Belton
CKE Restaurants Holdings, Inc. Diner Manager Belton
GHR Travel Nursing RN Charleston
Saga Education Online Tutor Charleston
Thriveworks Child Therapist Charleston
Teleperformance USA Customer Service Representative l Columbia, SC Onsite Only Columbia
GHR Travel Nursing SDU Nurse Columbia
Oculus Search Partners Structural Project Engineer Columbia
Pampered Pets Mobile Resort Animal Groomer Conway
Cortech Administrative Assistant Fort Mill
Cortech BDC Assistant Fort Mill
TMX Finance Site Manager Goose Creek
Oculus Search Partners Bridge Supervisor Greenville
Oculus Search Partners Multi-Family Estimator Greenville
Jobot Pedodontist Greenwood
Encompass Health RN Hardeeville
Carowinds Lifesaver Lancaster
Berkeley County School District Child Speech Therapist Moncks Corner
Oculus Search Partners HR Generalist Orangeburg
IntelyCare RN Piedmont
Cortech Administrative Assistant Rock Hill
Hey guys, here are some recent job openings , feel free to comment here if you have any questions, I'm at the community's disposal! If you encounter any problems with any of these job openings please let me know that I will modify the table accordingly. Thanks!
submitted by No_Competition4897 to SCJobsforAll [link] [comments]


2023.05.27 15:03 subredditsummarybot Your weekly /r/ClassicRock roundup for the week of May 20 - May 26

Saturday, May 20 - Friday, May 26

Top 60s

score comments title & link mirrors
307 32 comments [1967] Grace and Janis, 1967
295 65 comments [1968] Was never the same after hearing this
31 11 comments [60s] "This record blew me mind up"
15 1 comments [60s] Led Zeppelin - Communication Breakdown
6 2 comments [1964] The Yardbirds - Smokestack Lightning [AM] [Dzr] [SC]
 

Top 70s

score comments title & link mirrors
675 123 comments [70s] Ozzy! Show some love, people!
288 69 comments [1973] Legendary Classic Rock Band-Grand Funk Railroad.
250 88 comments [70s] Most underrated band of the 70s
188 57 comments [70s] Jeff Beck, Steve Cropper, Robbie Robertson, BB King, Jimmy Page, Keith Richards, Carlos Santana, The Edge, and John Fogerty
146 71 comments [1977] Classic Punk Rock Legends-The Sex Pistols.
 

Top 80s

score comments title & link mirrors
636 190 comments [80s] Gary Numan & Billy Idol at Cruel World Festival, Pasadena, California, May 20th, 2023.
244 46 comments [1985] Black Sabbath At Live Aid In 1985.
202 28 comments [1988] Classic Americans Alternative Rock Legends-The Pixies.
145 39 comments [1980] Classic American Punk Rockers ( Misfits ).
81 11 comments [1980] The Legendary Bob Marley And The Wailers.
 

Top Remaining

score comments title & link mirrors
576 101 comments Tina Turner Dead: Legendary Rock & Soul Singer Was 83
351 301 comments Rock and Roll Hall of Fame has lost its meaning.
321 52 comments Classic Punk Rock Legends ( Dead Kennedys ).
281 78 comments Any of you guys dig Joy Division?
266 31 comments Alex Lifeson & Geddy Lee of Rush playing double neck guitars
 

Top 5 Most Commented

score comments title & link mirrors
42 391 comments Three bands and their entire discography. Who are you picking?
62 241 comments Deep Cuts
50 220 comments Ok! Tough job but… top 5 Classic Rock vocalists. Think voice not performance. All answers are subjective.
35 185 comments Classic rock songs you hear constantly
32 160 comments Songs where "all hell breaks loose?"
 
submitted by subredditsummarybot to ClassicRock [link] [comments]


2023.05.26 18:32 lamiaDepp Ted Bundy

Ted Bundy submitted by lamiaDepp to u/lamiaDepp [link] [comments]


2023.05.26 18:25 CarelessSignature Mapa de utilização dos plantéis na Primeira Liga

Mapa de utilização dos plantéis na Primeira Liga submitted by CarelessSignature to PrimeiraLiga [link] [comments]


2023.05.25 16:02 bigballzeegracia I live in Anderson SC where can I find the best gem stones besides diamond Hill.

submitted by bigballzeegracia to rockhounds [link] [comments]


2023.05.24 22:00 tfpearce An afternoon in our Happy Place

An afternoon in our Happy Place
Connie and I, relaxing along Broadway Lake in Anderson SC. A little wine and a lot of love between us...
submitted by tfpearce to nudism [link] [comments]


2023.05.22 23:00 Gloomy_Category1416 Air Force History Reports

Air Force History Reports
Air Force History Reports
https://airforcehistoryindex.org/search.php?q=4404&h=100&F=1/1/1990&o=200

Example Report Sample:
SAUDI SECURITY FORCES INTERCEPTED A LARGE SHIPMENT OF EXPLOSIVES CARRIED IN A CHEVROLET CAPRICE 29 MAR.
ORDER ISSUED STATING THAT MILITARY UNIFORMS MUST BE CONCEALED WHILE TRAVELING OFF OF SECURE COMPOUNDS.
FRENCH AIR FORCE MIRAGE 2000 CRASHED AFTER COLLIDING WITH ANOTHER MIRAGE 2000 WHILE ON FINAL APPROACH TO KING ABDUL AZIZ AIR BASE, DHAHRAN, KILLING THE PILOT.
TERRORIST KILLED NINETEEN UNITED STATES AIR FORCE (USAF) PERSONNEL, AND WOUNDED 547 PEOPLE WHEN THEY DETONATED A BOMB OUTSIDE THE AL KHOBAR TOWERS, KING ABDUL AZIZ AIR BASE, DHAHRAN 25 JUN 1996.
REMAINS OF THOSE KILLED WERE FLOWN TO DOVER AIR FORCE BASE DE 27 JUN WHERE A CEREMONY WAS HELD IN THEIR HONOR. MAJ GEN CARL E. FRANKLIN SERVED AS COMMANDER, JOINT TASK FORCE SOUTHWEST ASIA (JTF - SWA). GEN FRANKLIN WAS REASSIGNED AS COMMANDER, 9 AIR FORCE, AND COMMANDER, CENTRAL AIR FORCES (CENTAF), SHAW AIR FORCE BASE SC. MAJ GEN FRANKLIN RECEIVED A NOMIONATION TO THE RANK OF LT GEN. ON 26 APR 96, MAJ GEN KURT B. ANDERSON ASSUMED THE POSITION OF COMMANDER, JTF - SWA.

https://preview.redd.it/kbi2mmpn5g1b1.png?width=1080&format=png&auto=webp&s=1f3327c911289436f50a3ae0731b4ad4db946469
submitted by Gloomy_Category1416 to AirForce [link] [comments]